Consolidated Borough of Quil Ceda Village

Marine Drive Shoulder Improvements Project

Tulalip Tribes Bid Solicitation Number 14-358

In Accordance with the Drawings and Specifications Prepared By:

Parametrix
719 2nd Avenue, Suite 200
Seattle, WA 98104

Construction Manager for the Project

The Tulalip Tribes of Washington
Consolidated Borough of Quil Ceda Village
8802 27th Avenue NE
Tulalip, WA 98271-9694
Attn: Debbie Bray
Telephone: 360-716-5024

Description of Project

This contract provides for the installation of approximately 7,300 linear feet of HMA shoulder improvements including roadway embankment construction, channelization, guardrail, an illumination system, and a pile-supported pedestrian path. The project is located on the Tulalip Reservation. Completion time is limited to 90 working days.

Bid and Other Dates

  • Pre-Bid Meeting: A mandatory pre-bid meeting is not required.
  • Bid Due Date: Tuesday, July 5th, 2016 at 3:00 PM