Consolidated Borough of Quil Ceda Village

QCV Boeing Site Drainage Repair

Project No. QCV-CP-21-006

Project Manager:

Lukas Reyes
Phone: (360) 716-5022
lreyes@tulaliptribes-nsn.gov

Project Description:
The Quil Ceda Village Boeing Site Drainage project will consist of demolition and removal of certain culverts and installation of identified culvert. Project also includes installation of gravel with grading of identified locations as indicated below with in the work area of the Quil Ceda Village Boeing Test Site on the Tulalip Reservation.