Nicole Smith
Senior Project Manager
360-716-4697
nicolesmith@tulaliptribes-nsn.gov
Project Description:
The Tulalip Tribes of Washington (“Tribes”) is currently seeking Proposals from qualified firms to provide Engineering Services for the Public Works Fuel Tank Protection project. The existing fuel tank was installed in 2017 and is a dual gasoline/diesel tank holding a combined total of 20,000 gallons in fuel. The existing tank is within the acceptable separation distance from the existing homes on Joseph Charles Jr. Loop Road. In order to secure HUD funding for housing improvements, the existing fuel tank must have protection placed around it to limit thermal radiation in the event of a fire. The protection must meet the requirements of 24 CFR Part 51, Subpart C, other relevant sections of the CFR, HUD requirements and the Tulalip Tribal Codes.