Consolidated Borough of Quil Ceda Village

Project No. QCV - CP - 16 - 227

Project Title

Project No. QCV - CP - 16 - 227
Bid Package 16 - 227 - Silver Village Pavement Preservation and Pedestrian Access Improvements Project

In Accordance with the Drawings and Specifications Prepared By:

Parametrix
719 2nd Avenue, Suite 200
Seattle, WA 98104

Construction Manager for the Project

The Tulalip Tribes of Washington
Consolidated Borough of Quil Ceda Village
8802 27th Avenue NE
Tulalip, WA 98271-9694
Attn: Debbie Bray
Telephone: 360-716-5024

Description of Project

This contract provides for asphalt pavement preservation and/or reconstruction maintenance of approximately 5,600 feet of existing road on Reuben Shelton Drive, Steve Williams Drive, Verle Hatch Drive, Gus Smith Drive, Ernie Cladoosby Jr. Drive, and Ellison James Road in Tulalip, Washington. In addition to the roadwork, the project includes site preparation, removals, grading, paving, drainage, striping, signing, traffic calming, sidewalks, and bus stop waiting area with shelter, utility adjustment, temporary traffic control, erosion control and restoration. The project is located on the Tulalip Reservation. Completion time is limited to 33 working days.

Bid and Other Dates

  • Pre-Bid Meeting: A non-mandatory pre-bid meeting will be held on Monday, June 20th, 2016 at 9:00 AM
  • Bid Due Date: July 5th, 2016 at 2:00 PM