Project Description:
The Quil Ceda Village Remedy Grinder Pump Station Project includes construction of a grinder pump station (E-One) and approximately 215 linear feet of 1.25-inch-diameter sewer force main. The force main is installed inside an existing gravity main. The grinder pump station consists of a duplex submersible pump package, a 48-inch Type 3 manhole, and an alarm panel. The project also includes traffic control and restoration of approximately 100 square feet of landscaping.