Pavement Projects – 28th Dr NW – 81st St NE – Totem Beach Rd

Project No. QCV-RFQ-2022-04

Project Manager for the Project:

Christina Parker
Transportation Department Manager

Tulalip Tribes of Washington
116th St NE Job Shack
11404 - 34th Avenue NE
Tulalip, WA 98271-9694

christinaparker@tulaliptribes-nsn.gov

Project Description:
The Pavement Rehabilitation 2021 – Schedule A: 28th Drive NW project will include pavement rehabilitation of the existing streets, removal and replacement of existing curb and gutter, Hot Mix Asphalt (HMA) pavement, replacement of existing driveways, storm sewer improvements, installation of a water quality treatment device, underdrains, and Fire Hydrant resetting.

Schedule B: 81st Street NE project will include pavement rehabilitation of the existing streets, partial removal and replacement of existing curb and gutter, Hot Mix Asphalt (HMA) pavement, storm sewer improvements, installation of a water quality treatment and infiltration device, and illumination improvements.

Schedule C: Totem Beach Road will include pavement rehabilitation of the existing streets, removal and replacement of existing curb and gutter, removal and replacement of existing sidewalk, Hot Mix Asphalt (HMA) pavement, HMA Overlay, replacement of existing driveway entrances, storm sewer and bioswale improvements.

The projects are located on the Tulalip Indian Reservation.

Native American Preference related to contracting, subcontracting, and suppliers in the project is required and must meet The Tulalip Code, Chapter 9.05.