Consolidated Borough of Quil Ceda Village

Underground Injection Control (UIC) Trench Restoration

Tulalip BO Number 19-008

Project Manager for the Project

QCV Project Management-Utilities

8802 27th AVE NE, Tulalip, WA.
Attn: Lukas Reyes
Telephone: 360-716-5022

lreyes@tulaliptribes-nsn.gov

Description of Project

The Underground Injection Control (UIC) Trench Restoration Project includes replacing portions of the existing underground injection control system located adjacent to the east side of Quil Ceda Boulevard. The System consists of an infiltration trench with a main reclaimed water line that supplies 19 branch distribution vaults, with each distribution vault serving 10 discharge ports. The major items of work include selective demolition and disposal of the existing discharge port piping and backfill, installation of new discharge port piping and backfill, replacement of pressure reducing valves, installation of groundwater monitoring wells, traffic control, erosion and sediment control, and surface restoration.

Bid and Other Dates

  • Bid Due Date: Thursday, February 13, 2020 at 2:00 PM