MBR Treatment Facility Upgrade
Tulalip Tribes Bid Solicitation Number 2017-004
Project Manager for the Project
The Tulalip Tribes of Washington
8802 27th Avenue NE
Tulalip, WA 98271-9694
Attn: Mr. Lukas Reyes
Telephone: 360-716-5022
lreyes@tulaliptribes-nsn.gov
Description of Project
This Tulalip Tribes project provides for the improvement of their Membrane Bioreactor (MBR) Wastewater Treatment Plant (WWTP). The construction of this project includes:
- Supply and installation of a headworks drum screen.
- Supply and installation of two blowers, sanitary sewer piping, and supports.
- Supply and installation of Kubota submerged membrane units (SMUs) in MBR tanks. Supply includes all piping up to and including air and permeate 2-inch isolation valves.
- Stainless steel and ductile iron pipe supply and installation.
- Supply and installation of electrical motor control center (MCC), duct banks, conduit, and fiber optic cable.
All incidental and related work to complete.
Bid and Other Dates
- Mandatory Pre-Bid Questions: All pre-bid questions and clarifications should be made in writing to the Contruction Manager no later than five (5) working days prior to bid opening - see Notice to Bidders.
- Bid Due Date: May 7, 2018 at 2:00 PM